9285 Koch, Christopher P. Addendum to Phase I Survey of the Proposed SR 82 Bridge Replacement, Jackson County, Georgia

2015 project description: The proposed project would consist of the replacement of the bridge carrying SR 82 Spur over the North Oconee River (see Figure 1. Project Location Map). The bridge would be replaced at its existing location and an off-site detour would be utilized during construction.

Jackson 2016
9286 Quirk, Phillip W. Second Addendum to Phase I Archaeological Survey of the Proposed Improvements to Jimmy DeLoach Parkway at US 80

The Jimmy DeLoach Parkway Phase II (P.I. 522790) and the Jimmy DeLoach Parkway at US 80 Interchange (P.I. 0007259) project designs are interconnected, and have an approximately 3,750 foot overlap between US 80 and the CSX Railroad crossing.

Chatham 2016
9287 Pappas, Andrew A. Addendum to a Phase I Archaeological Resources Surveyof the Proposed Widening and Reconstruction of SR92/Dallas Highway

The original project would widen approximately 6.36 miles of existing SR 92/Dallas Highway starting at Malone Road in Douglas County and going north to Nebo Road in Paulding County.

Douglas 2016
9288 Quirk, Phillip W. Reevaluation of the Northwest Corridor Project, Phase VI, Cobb County, Georgia

The Northwest Corridor Project (NWCP) is located in the Atlanta metropolitan area, northwest of downtown Atlanta, Georgia. It encompasses portions of Cobb and Cherokee counties. Within the NWCP, Interstate (1-)75 extends to the northwest from downtown Atlanta.

Cobb 2016
9289 Pope, Natalie Adams Buford Highway Pedestrian Safety Improvements Project Phase II Archaeological Assessment of SR 13 from Afton Lane to Shallowford Terrace

The proposed project would provide upgraded pedestrian facilities by upgrading or adding new sidewalk along both sides of SR 13/Buford Highway, adding a raised median from 700 feet northeast of Afton Lane to Shallowford Terrace, adding pedestrian refuge islands with pedestrian hybrid beacons, upg

DeKalb 2016
9290 Sipe, Ryan O. Addendum to Phase I Archaeological Survey of the Proposed Roundabout at the Intersection of SR 275 and CR 307/Rincon-Stillwell Road, Effingham County, Georgia

The proposed project is an addendum to the phase I archaeological survey of the proposed roundabout at the intersection of SR 275 and CR 307/Rincon-Stillwell Road in Effingham County, Georgia (P.I. No. 0009872, HP No. 131119-009) (Sipe 2015).

Effingham 2016
9291 Blackwelder, Jon R. 2nd Add. to Ph. I Archaeological Survey of I-75 and SR 31/Madison Highway (Exit 11), Lowndes Co., Georgia (formerly, Phase I Archaeological Survey of Five Interchange & Overpass Improvements)

SR 31 currently consists of a four-lane typical section with depressed median, rural shoulders and no left-turn lanes at the on-ramp intersections.

Lowndes 2016
9292 Koch, Christopher P. Phase I Archaeological Survey of the Proposed Bridge Replacement on CR 611/Biackhall Road at Rum Creek

The proposed project would reconstruct the existing structurally deficient bridge on Blackhall Road over Rum Creek in northwest Henry County. The project would include reconstructing portions of Blackhall Road to correct a substandard sag vertical curve in which the existing bridge is located.

Henry 2016
9293 Koch, Christopher P. Phase I Archaeological Survey of the Proposed Multi-Use Path on Redwine Road

The proposed project would consist of the construction of a 10-foot multiuse trail along Redwine Road in two locations (see Figure 1. Project Location Map). The first location would consist of trail construction on both sides of Redwine Road between Birkdale Drive and Newhaven Drive.

Fayette 2016
9294 Roberts, Joseph Phase I Archaeological Survey of the Proposed Fairburn Streetscapes, Fulton County, Georgia

The project limits include a five block stretch on US 29 from Malone Street to approximately 175 feet north of Strickland Street, and a section of East Broad Street from Smith Street to Campbellton Street. The project length is approximately 2,575 feet (.48 mile).