Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
9295 McCarley, Billy J. Second Addendum of Phase I Archaeological Survey of the Proposed Two Interchanges on Interstate 75, SR 7 and SR 122

Moreland Altobelli Associates, Inc (hereafter called MAAI) performed a second addendum Phase I archaeological survey of two interchanges (SR 7 and SR 122) along Interstate 75 (I-75) in September 2016.

Lowndes 2016
9296 Pappas, Andrew A. Phase I Archaeological Survey of the East Point Intersection Upgrades and Streetscaping Improvements, Fulton County, Georgia

The proposed project would consist of upgrading intersections and streetscapes in downtown East Point, Georgia to include provisions for continuous bicycle and pedestrian facilities, as well as to improve travel operations of the corridors proposed for enhancement.

Fulton 2016
9297 Handley, Brent M. Addendum to the Phase I Archaeological Survey of the Proposed New Interchange at I-95 and CR 90/Bellfast Keller Road, Bryan County, Georgia

In December 2012, and between May 20 and August 4, 2014, Environmental Services, Inc. (ESI) conducted a Phase I archaeological survey of the Proposed Interchange at I-95 and Belfast Keller Road, in Bryan County, Georgia [GDOT Project No. PI 0012659]. The proposed GDOT project P.I.No.

Bryan 2016
9298 Southerlin, Bobby G. Cultural Resources Survey of the Check Redlands Timber Sale Chattahoochee-Oconee National Forests Greene County, Georgia

In May and June of2016, Archaeological Consultants of the Carolinas, Inc. (ACC) conducted an archaeological survey of the cumulative 364 acre Check Redlands Timber Sale.

Greene 2016
9299 Williams, Siska GDOT Archaeological Assessment: Reevaluation of I-285 at SR 141

The proposed project would widen the westbound ramp from State Route (SR) 141/Peachtree Industrial Boulevard southbound to 1-285 from a single 16-foot lane to two 12-foot lanes in DeKalb County, Georgia.

DeKalb 2016
9300 Lowrey, Jonathan D. Addendum to a Phase I Archaeological Survey of the SR 54 Pedestrian Bridge and Trail, Fayette County, Georgia.

Since the 2015 original survey, the project APE has changed. The new addendum APE under consideration is a curve extension of the trail APE as seen in Figures 1 and 2. This extension is being considered in order to avoid a potential wetland impact.

Fayette 2016
9301 Baughman, Pamela J., Blackwelder, Jon R. Addendum to the Phase I Archaeological Survey for the Proposed Median Crossover Improvements Along SR 3/US 19 from the State Line to County Road (CR) 219 in Thomas County, Georgia

The proposed project is located along SR 3/US 19 from the state line to CR 219 in Thomas

Thomas 2016
9302 Lewis, Clifford Thomas, Stack, Meg, Prendergast, Eric Phase II Archaeological Testing of Sites 9BR1131 and 9BR1132: Datlon Expansion Project

Transcontinental Gas Pipeline Company, LLC (Transco) is seeking a Certificate of Public Convenience from the Federal Energy Regulatory Commission (FERC) pursuant to Section 7 (c) of the Natural Gas Act for the construction and operation of a 111.7-mile natural gas pipeline (the Project) in northw

Bartow 2016
9303 Owens, Daphne L. Addendum to the Archaeological Survey for the Multi-Use Trail, Coweta County, Georgia

The project is completely within the City of Senoia. The project will complete the 3 m (10 ft) wide trail from Autumn Creek Dr 1.6 km (1.01 mi) to Seavy St.

Coweta 2016
9304 Quirk, Phillip W. Addendum to Phase I Archaeological Survey of the Proposed Elliott Road Bridge Replacement at Walnut Creek, Henry County, Georgia

The proposed project involves the replacement of the County Road (CR) 131 /Elliott Road Bridge over Walnut Creek. The project is located approximately 0.5 mile outside the city limits of McDonough, Georgia in Henry County.

Henry 2016