Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
7304 Duff, Eric Anthony Archaeological Re-assessment of Project STP-001-6-(26), Gordon County

Project STP-00 1-6(26) would widen and reconstruct US 41/SR 3 in Gordon County. The proposed project on US 41 /SR 3 would begin at Chandler Street then continue northerly to an end point at the North Dalton Bypass/CR 379.

Putnam 2005
7305 Richardson, Rick R. Archaeological Assessment of Project STP-1800(14), Gordon County

The proposed project would consist of the construction of passing lanes on SR 136 at two locations between Resaca and Nickelsville. Site 1 will provide an eastbound passing lane between Mile Post 10.0 and Mile Post 11.3.

Lowndes 1986
7306 Duff, Eric Anthony Archaeological Assessment of Project STP-018-1(71), Gordon County

Project STP-018-1(71) would construct turn lanes at the intersection of US 411/SR 61 and SR 136 in Gordon County. The proposed project on US 411/SR 61 would begin at M.P. 12.34 and end at M.P. 12.56. The proposed project on SR 136 would begin at M.P. 23.38 and end at M.P. 23.53.

Lowndes 1986
7307 Shirk, Elizabeth C. Archaeological Assessment of Gordon County GEPA Project

The proposed intersection improvement project consists of the addition of left and right turn lanes for the North and South bound lanes of SR 61/ US 411 at the intersection of SR 61/US 411 and SR 136. Existing right-of-way varies from 61 m (200 ft) to 36.5 m (120 ft).

Lowndes 1987
7308 Duff, Eric Anthony Archaeological Re-assessment of Project BHN-065-2(15), Gordon County

Project BHN-065-2 (15) would replace the structurally deficient bridge at Pine Log Creek on SR 53 in Gordon County. The proposed project would begin approximately 115 meters (377 feet) west and end approximately 110 meters (360 feet) east of the existing bridge structure.

Lowndes 1988
7309 Richardson, Rick R. Archaeological Assessment of Project STP-065-2(16), Gordon County

The proposed project would consist of the construction of three passing lanes on SR 53, and a right turn lane for the Sonoraville School. A west bound passing lane will be constructed from MP 14 . 67 to 15.80.

Lowndes 1990
7310 Duff, Eric Anthony Archaeological Assessment of Project MLP-3(226), Gordon County

Project MLP-3 (226) would widen US 41 / SR 3 / North Wall Street in Calhoun, Georgia.

Lowndes 1995
7311 Duff, Eric Anthony Archaeological Assessment of Project BHN-065-2(15), Gordon County

The proposed project consists of the widening of the bridge at Pine Log Creek on SR 53 in Gordon County. The proposed project on SR 53 would begin approximately . 24 kilometer (.15 mile) west and end approximately . 24 kilometer (. 15 mile) east of the existing bridge structure.

Lowndes 1995
7312 Richardson, Rick R. Archaeological Assessment of Project IM-75-3(197), Gordon County

The proposed project is an interchange improvement at I-75 and SR 225 in Gordon County. The proposed project would begin on SR 225 west of I-75 ramps then would continue easterly to an ending point east of I-75 ramps.

Gwinnett 2001
7313 Duff, Eric Anthony Archaeological Assessment of Project IM-75-3(189), Gordon County

The proposed project would reconstruct the I-75 bridges over SR 156 in Gordon County. The project also includes minor widening on SR 156 adjacent to I-75. The proposed project would begin approximately 120 meters (400 feet) west of I-75 then continue easterly on SR 156 ending at CR 483.

Walton 2001