8445 Entorf, Robert F., Higginbotham, Brandon Archaeological Assessment of Project BRS-1961(4), Grady/Thomas Counties

The proposed project would construct a 48.8 m x 11.6 m (160 ft x 38 ft) concrete bridge structure on new alignment north of the existing bridge on SR. 188 at Barnett's Creek northeast of Cairo, Georgia in Grady County.

Taylor 1994
8446 Wynn, Jack T. Archaeological Survey Along Roadways in the Lake Russell Wildlife Management Area, Habersham and Stephens Counties, Georgia

An archaeological survey was conducted by the author in January, 2003, along the roadways within the Lake Russell Wildlife Management Area in Habersham and Stephens Counties. This was done prior to planned timber operations there.

Upson 1994
8447 McIntosh, Paul, Duff, Eric Anthony Archaeological Assessment of Project STP-0003-00(782), Pierce County

The proposed project would consist of shifting CR 178/Hackelbarney Road approximately 15 feet to the west to improve the intersection alignment at the railroad crossing and intersection with SR 38. Existing right-of-way on CR 178 is approximately 60 feet.

Fulton 2013
8448 Anderson, Nain E. RS- 2857(1), Gordon County; Clearinghouse Doc. No. 77-03-10-04

Enclosed is a copy of the archaeological survey report for this bridge replacement. Two sites - 9Go4 and 9Go5 were located within the project limits.

Emanuel 1999
8449 Botwick, Brad, Matternes, Hugh B. Phase I Archaeological Survey of the Proposed Bus Facility in Blackshear, Pierce County, Georgia.

The proposed project would consist of the construction of a transit administration building and bus maintenance bays to service Pierce County Transit.

Gwinnett 2014
8450 Research Design for Data Recovery Excavations at Sites 9HY70. 9HY222, and 9SP14, Upper Towalinga Reservoir, Henry and Spalding Counties, Georgia

This document presents a research design that has been developed for data recovery excavations at sites 9HY70, 9HY222, and 9SP14, in Henry and Spalding Counties, Georgia (Figure 1).

Cobb 2014
8451 Whitley, Thomas G., Butler, C. Scott History of Development and Current Status of Archaeological and Architectural Resources at the Ford Plantation, Bryan County, Georgia

The purpose of this report is twofold; first to address the current status of identified cultural resources on the Ford Plantation Development property; and second to provide an assessment of the nature of future impacts to those resources in the current design plan.

Stephens 2014
8452 Richardson, Rick R. Archaeological Assessment of Project NH-065-3 (47), Pickens County

The proposed project would improve the intersection of CS-603/Spring Street and SR-53 by relocating Spring Street approximately 9.14 m (30 ft) west to intersect SR-53 opposite CR-305/Burnt Mountain Road. The total project length is approximately 198.12 m (650ft).

Newton 2012
8453 Entorf, Robert F., Higginbotham, Brandon Archaeological Assessment of Project STP-8042(8), Muscogee County

The proposed project will relocate Flat Rock Road intersection on new location approximately 91.4 m (300 ft) east of the existing intersection with SR 22/US 80 in Muscogee County.

Cobb 2013
8454 Thomas, Larissa A. Cultural Resource Literature Search for Seven Proposed Cell Tower Sites Across Georgia

Under contract with Martin and Associates Environmental Services, TRC has conducted a cultural resource literature search for seven proposed cell tower collocation sites in Cherokee, Lowndes, DeKalb, Columbia, Henry, Gwinnett, and Walton counties, Georgia (Figures 1-7).

Paulding 2013