8465 Paglione, Teresa L. Archaeological Assessment of Projects FR-178-1(33) and (34), Polk County

Project FR-178-1(33) begins just west of the Cedartown Bypass at the intersection of us 278/SR 6 and Woodall Road and extends easterly for approximately 4.6 miles, ending at the intersection of us 278/SR 6 and Old Cedartown Road.

Clayton 2014
8466 Schoeneberg, Erica Archaeological Assessment of Project MLP-943(1), Jasper County

GDOT project MLP-943(1) proposes to construct a connector road east of Monticello from the intersection of SR 16 and SR 3 80 northwesterly on new location to intersect SR 83.

Jasper 2014
8467 Rock, Carolyn Archaeological Survey, Proposed Dean Forest- Cemetery Hill 230kV Transmission Line, Chatham County, Georgia

The proposed project consists of construction of a 230 kV overhead transmission line supported by a series of concrete or steel monopoles. The project corridor is approximately 3.2 km (two miles) long by between approximately 9 m (30 ft) and 30 m (100 ft) wide.

Newton 2014
8468 Koch, Christopher P. Hamilton-Palmetto Creek Trail Phase Ill & Walking Amenities Phase I

PI No. 371770, Harris County proposes to construct Phase 3 of a multi-use path to connect Phases 1 and 2 of the Palmetto Creek Walking and Bicycle Center from the City of Hamilton to the County Recreational Facility.

Floyd 2014
8469 Franz, David M. Phase I Archaeological Survey of the Paramore Hill Transmission Line, Jenkins County, Georgia

The week of February 2, 2015 Brockington and Associates, Inc. completed a background literature review and field investigations for a Phase I archaeological survey for the proposed Paramore Hill Transmission line located in eastern Jenkins County, Georgia near the city of Millen (Figures 1-2).

Habersham 2015
8470 Butler, C. Scott Background Research and Cultural Resources Investigations of the 115/25kV Buckhead Substation, Morgan County, Georgia.

The Georgia Power Company (GPC) is planning to build a new 115/25kV two feeder substation near the Buckhead community, outside the City of Madison in Morgan County, Georgia (Figures 1 and 2).

Putnam 2015
8471 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(189), Elbert/ Hart/Madison Counties

The following is being furnished to you for inclusion as written, in the appropriate environmental document: "In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-00MS(189), Elbert/Hart/Madison Counties has been surveyed with respect

DeKalb 2015
8472 Franz, David M. Bryan County Industrial Park Megasite (Phases 1 and 2) Cultural Resources Overview (Bryan County, Georgia)

Brockington and Associates, Inc.

Bryan 2015
8473 Pietak, Lynn Marie, Quirk, Phillip W. Addendum to Courtland Street Bridge at the CSX Railroad Bridge Replacement.

The proposed improvements would replace the Courtland Street Bridge over the CSX Railroad between MLK Drive and Gilmer Street within the City of Atlanta, Fulton County, Georgia. The project length is approximately 0.2 mile.

Muscogee 2015
8474 Cook, Fred C., Kirkland, S. Dwight Phase II Testing of the Proposed Tolomato Island Community Boat Ramp and Dock Facility in Mcintosh County, Georgia

While under contract with Tolomato Partners, LLLC, Southeastern Horizons, Inc., conducted a Phase II archaeological testing program on a parcel of land designated as Lot 41 and Tract B (hereafter referred to as the project area) within their residential development of "Tolomato Island Phase 1" in

Bibb 2015