8467 Rock, Carolyn Archaeological Survey, Proposed Dean Forest- Cemetery Hill 230kV Transmission Line, Chatham County, Georgia

The proposed project consists of construction of a 230 kV overhead transmission line supported by a series of concrete or steel monopoles. The project corridor is approximately 3.2 km (two miles) long by between approximately 9 m (30 ft) and 30 m (100 ft) wide.

Newton County, GA 2014
8468 Koch, Christopher P. Hamilton-Palmetto Creek Trail Phase Ill & Walking Amenities Phase I

PI No. 371770, Harris County proposes to construct Phase 3 of a multi-use path to connect Phases 1 and 2 of the Palmetto Creek Walking and Bicycle Center from the City of Hamilton to the County Recreational Facility.

Floyd County, GA 2014
8469 Franz, David M. Phase I Archaeological Survey of the Paramore Hill Transmission Line, Jenkins County, Georgia

The week of February 2, 2015 Brockington and Associates, Inc. completed a background literature review and field investigations for a Phase I archaeological survey for the proposed Paramore Hill Transmission line located in eastern Jenkins County, Georgia near the city of Millen (Figures 1-2).

Habersham County, GA 2015
8470 Butler, C. Scott Background Research and Cultural Resources Investigations of the 115/25kV Buckhead Substation, Morgan County, Georgia.

The Georgia Power Company (GPC) is planning to build a new 115/25kV two feeder substation near the Buckhead community, outside the City of Madison in Morgan County, Georgia (Figures 1 and 2).

Putnam County, GA 2015
8471 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(189), Elbert/ Hart/Madison Counties

The following is being furnished to you for inclusion as written, in the appropriate environmental document: "In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-00MS(189), Elbert/Hart/Madison Counties has been surveyed with respect

DeKalb County, GA 2015
8472 Franz, David M. Bryan County Industrial Park Megasite (Phases 1 and 2) Cultural Resources Overview (Bryan County, Georgia)

Brockington and Associates, Inc.

Bryan County, GA 2015
8473 Pietak, Lynn Marie, Quirk, Phillip W. Addendum to Courtland Street Bridge at the CSX Railroad Bridge Replacement.

The proposed improvements would replace the Courtland Street Bridge over the CSX Railroad between MLK Drive and Gilmer Street within the City of Atlanta, Fulton County, Georgia. The project length is approximately 0.2 mile.

Muscogee County, GA 2015
8474 Cook, Fred C., Kirkland, S. Dwight Phase II Testing of the Proposed Tolomato Island Community Boat Ramp and Dock Facility in Mcintosh County, Georgia

While under contract with Tolomato Partners, LLLC, Southeastern Horizons, Inc., conducted a Phase II archaeological testing program on a parcel of land designated as Lot 41 and Tract B (hereafter referred to as the project area) within their residential development of "Tolomato Island Phase 1" in

Bibb County, GA 2015
8475 Duff, Eric Anthony Archaeological Assessment of Project STP-0856(16), Gilmer Co.

Project STP-0856 (16) would add an eastbound and westbound passing lane on SR 52. Symmetrical widening on the eastbound passing lane would begin on SR 52 at mile post 16.0 then continue northeasterly to an end point at mile post 17.3.

Monroe County, GA 2015
8476 Freeman, Kirk A. A Phase I Cultural Resource Survey of the Proposed White Oak Solar Project Site, Burke County, Georgia

White Oak Solar, LLC (White Oak Solar) proposes to construct a photovoltaic solar power facility southwest of the City of Waynesboro, in Burke County, Georgia. AECOM Technical Services, Inc. (AECOM) was contracted to perform a Phase I cultural resources assessment for this project.

Monroe County, GA 2015