Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
8587 Gantt, Mary Elizabeth Phase I Archeological Resources Su!Vey Cobb Parkway Pedestrian Improvements - Revised

The proposed project would provide streetscaping and improved pedestrian facilities on both sides of Cobb Parkway/SR 19/US41 from Spring Road/Circle 75 to Akers Mill Road in Cobb County.

Bibb County, GA 2015
8588 Pomfret, James Archaeological Survey of Project NH-IM-475-1 (2-+7), Bibb County.

The proposed project would widen Zebulon Road and the Zebulon Road bridge over I-475 in Bibb County. The project would begin 450 feet east of the I-475 northbound exit and entrance ramps and end at Lake Wildwood Drive for a total distance of 0.5 mile. The existing right-of-way is 130 feet.

Coweta County, GA 2015
8589 Duff, Eric Anthony Archaeological Assessment of Project NH-011-1(44), Muscogee County

Project NH-011-1(44) would widen and reconstruct SR 1/US 27 and construct a new bridge on existing alignment over the Central of Georgia Railroad in Columbus. The proposed project would begin on SR 1/US 27 at 13th Street and continue northerly to an end point at 18th Street.

Cobb County, GA 2014
8590 Archaeological Assessment of Project BRM-M-8012(1), Muscogee County

Project BRM-M-8012(1) consists of a proposed bridge over the Chattahoochee River between Phenix City, Alabama, and Columbus, Georgia. Four alternative routes were surveyed.

Fayette County, GA 2015
8591 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-011-1(50), Muscogee County

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 1/US 27 in Muscogee County. The project would begin at the intersection of I-185 and end at the intersection of Moon Road.

Fulton County, GA 2015
8592 Entorf, Robert F. Archaeological Assessment of Project FLF-450(3), Muscogee County.

The proposed project would reconstruct and widen U.S.80 northeast of Columbus. The project as proposed would begin at the intersection of U.S.27Alt./S.R.85 then would extend easterly along existing U.S.80 to Kendall Creek.

Calhoun County, GA 2015
8593 Entorf, Robert F. Archaeological Assessment of Project FR-030-2 ( 17), Sumter County

The proposed project would widen and reconstruct S.R.30/U.S.280 in Americus. The project as proposed would begin at a point just south of the intersection of C.R.307/Felder Street then would extend northwesterly along S.R.30 to the intersection of S.R.27.

Fulton County, GA 2015
8594 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project SAPS-27(169), Sumter County

Project SAPS-27(169) involves signalization improvements for twenty locations in the city of Americus. Improvements include upgrading of traffic signal heads, upgrading of poles and mast arms, installation of traffic loop detectors, and various other equipment upgrades.

Walker County, GA 2009
8595 Duff, Eric Anthony Archaeological Assessment of Project NH-030-1(17), Sumter County

Project NH-030-1(17) would relocate and construct a right turn lane at the SR 49/SR 27 Dual intersection in Americus. The proposed project would begin on SR 49 at mile point 16.575 and continue northeasterly to an end point at 16.670.

Calhoun County, GA 2015
8596 Baughman, Pamela J. Archaeological Survey of Projects, PI #M004262-M004263, Jeff Davis and Bulloch Counties

Project M004262 would consist of milling, patching, resurfacing, striping, the rehabilitation of loop detectors, construction of rumble strips, and rehabilitation of the earthen shoulders along US 341/US 23/SR 19/SR 27 in Jeff Davis County.

Newton County, GA 2010