Report Number Author(s) Title Abstract Summary County Year
1421 Grover, Jennifer E. Phase I Cultural Resources Survey of Selected Areas at Townsend Bombing Range

Panamerican Consultants, Inc. (PCI), archaeologically surveyed approximately 447.6 hectares (1106 acres) in response to a Scope of Work for a Cultural Resources Survey of Selected Impact areas in the Townsend Bombing Range, McIntosh County, Georgia.

McIntosh 1995
1422 Ashley, Keith H. An Intensive Cultural Resource Assessment Survey of the Proposed Hopeful-Mt. Olive 46kv Transmission Line

A cultural resource assessment survey was conducted of the proposed Hopeful-Mt. Olive transmission line, Mitchell County, Georgia in September 1995.

Mitchell 1995
1423 Holland, Jeffrey L., Markham, M. Virginia Phase I Cultural Resource Survey of the Proposed 25 Acre Alpha Substation Tract

A cultural resources survey was conducted for the Tennessee Valley Authority prior to construction of the proposed substation near Alpha in Murray County, Georgia. The 25 acre project tract is located approximately 2.6 miles east of the Conasauga River.

Murray 1995
1424 Richardson, Rick R., Paglione, Teresa L. A Phase I Archaeological Survey of a Proposed Project Corridor for a Wetlands Advanced Wastewater Treatment Project for the City of Augusta

An intensive archaeological survey of a proposed project corridor for a wetlands advanced wastewater treatment concept was conducted in the area of the City of Augusta Wastewater Treatment plant and the Savannah River.

Richmond 1993
1425 Reed, Mary Elizabeth, Hamby, Theresa M. Phase I Archaeological Survey of a 50 Acre Tract for the Richmond County Board of Commissioners

New South Associates, between July 6 and 8, 1995, conducted three days of Phase I archaeological survey for the Richmond County Board of Commissioners. The survey covered a 50 acre tract south of Augusta. Only one site, a late 19th to early 20th century house site, was located.

Richmond 1995
1426 Bowen, William R. An Archaeological Survey of Rae's Creek Drainage Improvements Project (Berckmans Rd. To Boy Scout Rd.)

An intensive archaeological survey of the proposed drainage improvements to Rae's Creek failed to identify any archaeological resources within the area of potential environmental effects (construction limits and easements).

Richmond 1992
1427 Ehrenhard, Ellen B., Stanyard, William F. Phase I Cultural Resources Survey of the Smyrna-Ebenezer-Stanton Road Widening Projects

In November 1994, Garrow & Associates, Inc., conducted Phase I cultural resources survey of an 80-foot wide, seven-mile long road widening corridor along Smyrna, Ebenezer, and Stanton roads, in Rockdale County, Georgia.

Rockdale 1995
1428 Investigations at Late Discovery Sites 9Ro112 and 9Ro113, Big Haynes Reservoir

On September 8, 1995, Ms. Virginia Lange contacted Garrow & Associates to report the existence of an archaeological site within the flood pool of Big Haynes Reservoir, which is currently under construction. William F. Stanyard, Archaeologist, spoke with Ms. Lange and her brother, Mr.

Rockdale 1995
1429 Wood, W. Dean An Intensive Cultural Resources Survey of Florence Marina State Park

An intensive cultural resources survey was conducted at Florence Marina State Park from 10 to 20 April 1990. The park is jointly owned by the Mobile District, Corps of Engineers and the Georgia Department of Natural Resources but is operated by the State.

Stewart 1991
1430 Whitley, Thomas G. A Cultural Resources Survey for the Proposed Collins Chip Mill Substation and Transmission Line

An intensive cultural resources survey was conducted by the Atlanta Branch of the Cultural Resources Section of Michael Baker Jr., Inc., on December 15th, 1995, for Oglethorpe Power Corporation in Tattnall County, Georgia. The survey encompassed 0.94 hectares (2.35 ac).

Tattnall 1995