Report Number Author(s) Title Abstract Summary County Year
1671 Williams, Luis M., Fenn, Thomas Phase I Cultural Resources Survey and Inventory of the Proposed Southern Natural Gas Company in O.D. Ocmulgee-Atlanta Loop Line 16 in O.D. Macon Branch Loop Line and the Georgia Portion of the 8.625 in O.D. East Tennessee Lateral

This report presents the results of Phase I cultural resources survey and inventory of the Georgia portions of the proposed Southern Natural Gas Company, Inc. East Tennessee Expansion Project. Fieldwork for this project was conducted during March and April of 1997 by R.

Clayton 1997
1672 Hamby, Theresa M. Phase I Archaeological Survey of the Clinton Road Widening

New South Associates conducted a Phase I archaeological survey of the proposed Clinton Road widening, Bibb County, Georgia on December 18, 1997. The survey of the approximately 1.3 mile corridor consisted of widening of existing alignment, in an urban setting.

Bibb 1997
1673 Gantt, Mary Elizabeth Cultural Resources Survey and Evaluation of the Lakewood Avenue Trolley Lone (Site 9Fu324)

In December of 1996, a literature review and an archeological resources survey was conducted for the Lakewood Avenue Bridge Replacement Site in Atlanta, Fulton County, Georgia.

Fulton 1998
1674 Stoops, Richard W., Kirkland, S. Dwight Phase II Evaluation of Sites 9Pa51, 9Pa54, 9Pa56, and 9Pa59 for the Colony Homes Development Tract and Proposed Taylor Farm Park Tract, Paulding County, Georgia

This report documents a Phase 11 archaeological and architectural assessment of four sites in Paulding County, Georgia, by TRC Garrow Associates, Inc. (formerly known as Garrow & Associates, Inc.), under contract with Colony Homes of Woodstock, Georgia.

Paulding 1998
1675 Fryman, Robert J. Phase I Archaeological Survey of the Proposed Haw Creek Substation and Transmission Line Corridor, Forsyth County, Georgia

Historic Preservation Consulting recently completed a Phase I archaeological survey of the proposed Haw Creek Substation and Transmission Line Corridor in southeastern Forsyth County, Georgia. The work was conducted for Georgia Transmission Corporation.

Forsyth 1998
1676 Rhodes, Cynthia Gass, Hamby, Theresa M. A Phase I Archaeological Survey of Hartley Bridge Road

On September 16-17, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Hartley Bridge Road, Macon, Bibb County, Georgia. The project corridor is located from Mount Pleasant Church Road to Houston Road, excluding the section of interchange.

Bibb 1998
1677 Hamby, Theresa M. Phase I Archaeological Survey of the Northside Drive Widening

New South Associates conducted a Phase I archaeological survey of the proposed Northside Drive widening, Bibb County, Georgia on March 19, 1998. The survey of the approximately 1.2 mile corridor consisted of widening of existing alignment, in a suburban neighborhood.

Bibb 1998
1678 Jordan, William R. Breckenridge Boulevard Extension GDOT Project MLP-964-(1)

On December 1997, Brockington and Associates, Inc. conducted an archaeological survey of the proposed Breckenridge Boulevard extension corridor in Gwinnett County, Georgia.

Gwinnett 1998
1679 Whitley, Thomas G. Archaeological Resources Survey for the Proposed N. Nicholls Substation, Coffee County, Georgia

An intensive cultural resources survey was carried out for the Georgia Transmission Corporation's proposed N. Nicholls Substation in Coffee County, Georgia. The total area surveyed included a roughly 2 hectare (5 acre) area of impact for the substation construction.

Coffee 1997
1680 Rhodes, Cynthia Gass A Phase I Archaeological Survey for McFarland Road

On January 28 and 29, 1998, New South Associates conducted a Phase I archaeological survey for the widening and improvements to McFarland Road, in Forsyth County, Georgia.

Forsyth 1998