4128 Quirk, Phillip W., Jordan, William R. Cultural Resources Reconnaissance Forest Park Quarry Expansion Site Clayton County, Georgia

R. S. Webb & Associates (RSWA) conducted a cultural resources reconnaissance of the proposed 48 acres Forest Park Quarry expansion project tract in October 2006.

Clayton 2006
4129 Quirk, Phillip W. Phase I Archaeological Survey of the Proposed Social Circle Bypass, Newton and Walton Counties, Georgia

The proposed project would consist of the construction of a new location bypass beginning at a point along SR 11 / South Cherokee Road south of the southern city limits of Social Circle in Newton County, and continuing northeasterly to East Hightower Trail in the vicinity of Standridge Drive near

Newton 2007
4130 Jenkins, Ellen, Holland, Jeffrey L. Phase I Cultural Resource Survey for the Proposed Stonecrest Bus Ride-Lot Project, Dekalb County, Georgia

Metro Area Transit Team contracted TRC to conduct a Phase I cultural resource survey for the Stonecrest Bus Ride Lot project in DeKalb County, Georgia. The area in question is composed of two adjacent parcels of land totaling approximately 17.2 acres.

DeKalb 2007
4131 Jordan, William R. Phase I Cultural Resources Survey Pumpkinvine Water Reclamation Facility Expansion Paulding County, Georgia

A Phase I cultural resources survey was conducted for the proposed Pumpkinvine Water Reclamation Facility (WRF) expansion in Paulding County, Georgia.

Paulding 2007
4132 Quirk, Phillip W. Phase I Archaeological Survey of the Proposed Turner Hill Road Improvements, Dekalb County, Georgia

During February 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed corridor for the Turner Hill Road Improvements project. The project corridor is located in DeKalb County, Georgia, and is approximately 1.1 miles in length.

DeKalb 2007
4133 Ward, Jeanne A. A Phase 1 Cultural Resources Survey Big Springs 230/25 kV Substation Troup County, Georgia

Georgia Transmission Corporation proposes to construct the Big Springs 230/25 kV Substation southeast of LaGrange, Georgia in Troup County (Figure 1).

Troup 1999
4134 Ward, Jeanne A. A Phase I Archaeological Survey Neyami 115/12 kV Substation, Lee County, Georgia

GTC proposes to construct the Neyami 115/12 kV Substation northwest of Leesburg, Georgia in Lee County (Figure 1). An archaeological survey was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended through 1992 (16 U.S.C. 470).

Lee 1999
4135 Markham, M. Virginia Phase I Cultural Resources Survey of the Proposed 10,000-Foot Monroe Waterline, Walton County, Georgia

TRC Garrow Associates, Inc., performed a cultural resources survey for the proposed 50-x-10,000-foot Monroe waterline in Walton County, Georgia. The project corridor follows the eastern side of Beaver Dam Creek, and is characterized by side slopes and creek floodplains.

Walton 1999
4136 Price, George D., Pietak, Lynn Marie Phase I Archaeological Survey for the Proposed West Ringgold-Center Point 230/115-kV Transmission Line, Whitfield and Catoosa Counties, Georgia

TRC conducted a Phase I archaeological survey for this proposed West Ringgold-Center Point TVA transmission line project from July 10-21, 2000.

Catoosa 2000
4137 Gantt, Mary Elizabeth, Vehling, Marcia Cultural Resources Survey of the Proposed Talbotton Mining Site Talbot County, Georgia

R.S. Webb & Associates conducted a Phase I cultural resources survey on May 1 and 2, 2000, of the proposed Talbotton Mining Site in Talbot County, Georgia. A literature review of the proposed mining site was conducted on October 19 and 20, 1998 and updated in April 2000.

Talbot 2000