Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
681 Ledbetter, Jerald Cultural Resource Survey of the Harbor Widening Project, Savannah, Georgia

An archeological survey of the proposed Savannah Harbor widening project area at Hutchinson Island, Chatham County, Georgia, was conducted between 27 March and 1 April 1984.

Chatham County, GA 1984
682 Garrow, Patrick H. Cultural Resources Survey of Proposed Peachtree City-Fairburn 115kv Transmission Line

Archaeological survey, including pedestrian survey and shovel testing, was performed on a proposed transmission line corridor. The corridor was 16.5 km long, 22.9 m wide, and traversed portions of Fayette, Fulton and Coweta counties in the Piedmont of Georgia.

Fayette County, GA 1986
683 Babits, Lawrence E., Simons, Susan Phase I Archaeological Survey of the Bull River Site

This report is the result of an archaeological survey in 1986 at the Bull River Site, (9CHAS861. Since the area is slated for development of a public marina, a survey was required to identify the existence of properties eligible for inclusion in the National Register of Historic Places.

Chatham County, GA 1986
684 Wood, Karen Green, Wood, W. Dean Cultural Resource Survey of Compartments 170 194-196 Oconee National Forest Greene and Morgan Counties

A cultural resources reconnaissance survey of 1820 ac (736.5 ha) in the Oconee National Forest in Greene and Morgan Counties, Georgia, was conducted for the U.S. Forest Service. Nineteen prehistoric sites, nine historic sites, one rock pile site, and eleven artifact occurrences were located.

Greene County, GA 1985
685 Webb, Robert S. Cultural Resource Survey Compartments 146 and 147, Oconee National Forest, Jasper and Putnam Counties, Georgia, Forest Service Contract 43-435h-5-505

During September of 1985, Robert S. Webb conducted a reconnaissance level cultural resource survey of 2149 acres in two compartments (146 and 147) of the Oconee National Forest in Putnam and Jasper Counties, Georgia.

Jasper County, GA 1985
686 Gresham, Thomas H., Rudolph, Teresa Perry Archeological Survey of Alternative Routes for the Fall Line Freeway, Georgia

Four alternative routes of a proposed divided highway connecting Columbus and Augusta, Georgia, were surveyed by examining a random 10% sample of the routes and 77 high probability areas, which were defined as river and creek crossings.

Muscogee County, GA 1986
687 Miller, Cynthia A., Wood, W. Dean An Archeological Reconnaissance Survey of the Proposed Grassy Mountain Pumped - Storage Facility, Murray County, Georgia

Oglethorpe Power Corporation is in the process of examining several alternative locations for a pumped-storage hydroelectric facility. one alternative location is in the Chattahoochee National Forest along Mill Creek in northeastern Murray County, Georgia, about 15 km northeast of Chatsworth.

Murray County, GA 1986
688 Webb, Robert S. Cultural Resource Survey and Testing, Morgan Road Proposed Transmission Line and Substation Site, Haralson County, Georgia

on June 8, 1985, Robert S. Webb conducted a 100 percent coverage cultural resource survey of the proposed Oglethorpe Power Corporation Morgan Road transmission line corridor and substation site in Haralson County, Georgia.

Haralson County, GA 1985
689 Ethridge, Robbie Franklin, Gresham, Thomas H. Archaeological Survey of the King Farm Coweta County, Georgia

This report presents the methods, results, conclusions, and recommendations of an archeological survey of the King Farm in southern Coweta County. The survey of the 67 1 ac farm was requested and sponsored by the owner, Mr.

Coweta County, GA 1986
690 Meier, Lawrence W. Cultural Resource Survey of the NW Cobb Sewer Line and Force Main Project

The project consists of constructing a sanitary sewer with accompanying lift station in the-immediate vicinity of the Lake Acworth Recreation Area, on property under the jurisdiction of the Corps of Engineers.

Cobb County, GA 1984